Steps for installing a charging station

2024-01-05

What are the requirements for installing a private charging station? Mainly including the following points:

Having fixed parking spaces (both property rights and leasing are acceptable): Installing charging stations requires a fixed parking space. If it is an underground parking space, it is also necessary to confirm whether there is good network signal.

Installing charging stations

The community agrees to install the charging station: The installation of the charging station must also obtain the consent of the community property. The vehicle owner should communicate with the property in advance to understand the situation and prepare the corresponding materials according to the requirements.

The electricity conditions are met: whether the parking lot can be electrified, whether the electricity conditions in the community can be met, etc., these also need to be confirmed in advance with the property management.

2. What is the process of installing a charging station?

The installation process of charging piles mainly includes three steps: property approval → installation of electricity meters → installation of charging piles

Installing charging stations

After the construction is completed, the charging pile service provider needs to report to the power company for on-site acceptance, inspect the charging equipment and charging conditions, and confirm that the charging equipment can operate normally without affecting other electrical equipment.

3. How to apply for a new energy meter?

After confirming the charging conditions, it is necessary to apply for a new energy meter. So how do I apply for a new energy meter? Generally, after signing the car purchase contract, you can apply for telegraph installation by yourself or entrust a 4S store to the local power supply company. After the power supply company provides a response to the power supply plan, you can go to the power supply company to handle the procedures within the validity period.

The installation process varies slightly in different regions, and the general process is roughly as follows: confirming installation conditions → applying for new energy meters → inspecting the site → issuing a plan → receiving materials → installation → acceptance inspection

Car owners need to provide the following information: (1) Electricity application form; (2) Customer's valid identification certificate; (3) Fixed parking space ownership certificate or property unit license certificate; (4) Proof materials issued by the street office or property management approving the use of charging and swapping facilities and external line access construction; (5) Technical parameters and materials of charging piles. (In addition to the above materials, other materials required by the power supply company shall also be provided, and the specific procedures shall be handled by the business hall.)

4. How to charge for the installation of charging stations?

The cost of installing charging piles mainly includes the construction fees and cable material fees that need to be paid to the installation personnel during the installation process.

The specific cost of installing a charging station depends on the specific situation. If the installation environment is simple and there are fewer cables, the cost will be lower; If the environment is complex and the cable is long and expensive, the specific cost may vary from place to place.

Generally speaking, the installation service of the charging station provided with the car is free within 30 meters of the charging cable, and there will be additional construction costs beyond 30 meters.

Therefore, it is recommended that car owners conduct on-site inspections of their parking spaces in advance and reduce installation costs by designing short routes. Generally, there are many distribution rooms in residential areas, and the owner can choose one that is close to the parking space, which can save a lot of costs during installation~


Focused on new energy vehicle charging equipment for 12 years

18038169304

  1. Having advanced charging station technology and solutions

  2. Good brand reputation and visibility

  3. Having a wide network of charging stations

  4. Established a cooperative relationship with the government

  5. Convenient payment methods and user management system

  6. Renewable energy and reducing carbon emissions